2016 Vermeer D23x30 S3

Comes with Drill Pipe! 1,316 hours.

Description

General Description:
2016 Vermeer D23x30 S3 Directional Drill:
-1,316 hours

2 3/8 drill rod.

Seller states Drill will arrive ready for the jobsite.

Locating System(s):
F2 Falcon Available at additional cost

Pipe:
(40) Pieces of 2 3/8 Drill Pipe.

While HDD Broker makes every effort to ensure the accuracy of the information provided by our Sellers, it is ultimately the Buyer's responsibility to confirm all details to their satisfaction prior to purchase. See our terms and conditions.